RDN Water Budget Project – Phase One:
Vancouver Island
Phase 1 of the Water Budget project will be used to identify areas of concern for further study (Phase 2). The main Phase 1 report provides an overview of the hydrogeology of the six RDN Water Regions on Vancouver Island, water budget methods and results.
The report is divided into 5 sections:
In addition to this report, the Agriculture Water Demand Model helps us better understand the amount of water required for agriculture, now and into the future.
Detailed technical graphs and maps are included in the Appendices and links – see PDF downloads marked .
Tips for non-technical readers:
- Improve your understanding with Water 101
- Move your mouse over coloured words for definitions and links to more info
- Consult the Glossary
1. Introduction
1.1 Background and Scope
1.2 Study Objectives and Goals
1.3 Scale of Assessment – Conceptual Water Budget
1.4 Report Terminology and References
2. Hydrogeological Conceptual Model
2.1 ARC-GIS Geodatabase Development
2.2 Available Information and Concurrent Projects
2.3 Data Compilation
2.4 Conceptual Water Budget Model Development
2.4.1 The Water Cycle
2.4.2 Surface Water
2.4.3 Groundwater Aquifers
2.4.4 Regional Geology
2.5 Surface Water Assessment and Water Budgets
2.5.1 Regional Hydrological Model
2.5.2 Surface Water Budgets and Stress Analysis
2.6 Groundwater Assessment and Aquifer Water Budgets
2.6.1 Approach Used For Water Budget Calculations
2.6.2 Aquifer Stress Assessment – Relative Ranking
2.6.3 Climate Variability Indicator and Implications for Aquifer Recharge
3. Water Budget
Water Region 1
Big Qualicum
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR1 – Big Qualicum as PDF
Water Region 2
Little Qualicum
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR2 – Little Qualicum as PDF
Water Region 3
French Creek
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR3 – French Creek as PDF
Water Region 4
Englishman River
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR4 – Englishman River as PDF
Water Region 5
South Wellington to Nanoose
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR5 – South Wellington to Nanoose as PDF
Water Region 6
Nanaimo River
- Regional Overview
- Surface Water Assessment
- Groundwater Assessment
- Water Management Planning
Download Water Budget for WR6 – Nanaimo River as PDF
For Water Region 7, go to
Gabriola, DeCourcy & Mudge
Gulf Islands Report
4. Data Gaps
9.1 Early Warning Monitoring and Cumulative Effects Analysis
9.2 Mandatory Submission and Review of Well Logs
9.3 Standard of Practice for Aquifer Testing and Cumulative Effects Analysis
9.4 New MOE/RDN Observation Wells
9.5 Reactivation of Discontinued Water Survey of Canada Gauges
9.6 Reporting System to Track Surface and Groundwater Use
Download Knowledge & Data Gaps as PDF
5. Recommendations & Conclusions
Recommended RDN Action Plan
10.1 Provincial and/or Local (RDN) Regulatory Guidance
10.2 Community Engagement
10.3 Near-Term Priorities
10.3.1 Geodatabase and User Interface
10.4 Medium-Term Priorities
10.4.1 Focus on Areas of High Stress
10.5 Long-Term Priorities
10.5.1 Other Important Data Sources
10.5.2 Remote Sensing Data (Land Cover & LAI)
10.5.3 LIDAR Data
Download Recommended RDN Action Plan as PDF
References
6. Appendices
Appendix A: Glossary of Terms
Download Appendix A as PDF
- See also Glossary, Acronyms & Units, Watershed & Aquifer 101
Appendix B: Bibliography
Download Appendix B as PDF
Appendix C: Waterline Geodatabase Layers
Download Appendix C as PDF – Note: LARGE DOWNLOAD (30MB PDF)
Appendix D: Methodology and Water Budget Calculations
Download Appendix D as PDF